ProjectsSouth Pars Gas Field Under DevelopmentPhases 20&21
Phase 20&21

South Pars Phases 20 & 21 Development Project

The project for development of this phase will be implemented by Iranian contractors and manufacturers in the form of EPC (Engineering, Procurement, & Construction).

The project will take place in Site 1, Pars Special Economic Energy Zone (PSEEZ) Site 1 in asalouyeh, Persian Gulf.

 The main objectives of this project are as follows:

  Daily Production of 50 MMscm/d treated gas for domestic consumption;
Annual Recovery of 1,000,000 tons of ethane, as feedstock for petrochemical industries;
  Annual Recovery of 1.05 million tons of premium grade LPG for export;
    Daily production of 75,000 barrels of stabilized and de-sulfurized condensates for export; and
  Daily Recovery of 400 tons sulfur for export.

 The scope of work of this development project is as follows:

  Construction and installation of 2 wellhead platforms equipped with free water knock-out drum (FWKD), test separator, utilities, access bridges and flare platform
  Drilling of 22 production wells; 
  Installation of two 32 inch sea lines and two 4.5 inch piggy-back lines approximately,212 Km. to transfer glycol;
  Construction of a stand alone gas treating refinery in Site 1 of Pars Special Economic Energy Zone asalouyeh, Bushehr Province;
  Supplying Electricity from the projects’ common power plant;
  The required infrastructure      

The execution of the project was handed over to Oil Industry Engineering and Construction Co. on May 30, 2009, and the projected started on 15 June 2010, according to Addendum No. 1 to the Contract. The project will be completed in 40 months, provided it will yield its early production at the end of month 35.