ProjectsSouth Pars Gas FieldProjects in OperationPhases 4&5
Phases 4&5

The project for development of Phases 4 & 5 has been designed and implemented to produce 56 MMscf/d of natural gas.


 The objectives of developing phases 4 and 5 are as follows:
 
    Daily production of 50 million cubic meters of natural gas;
     Daily production of 80,000 bl of gas condensate;
     Annual production of 1 million tons of ethane as petrochemical plants feedstock;
     Annual production of 105,000 tons of liquid gas (propane and butane) and LPG for export;
     Daily production of 400 tons of sulfur;
     The lump sum of the contract is $192 million; and
     The share of local players amounting to 42%has been materialized.


 Offshore Facilities:
     Two production platforms, some 100 km far from the shore with 24 wells;
     Two 32 inch offshore pipeline for transferring gas to the onshore refinery; and 
     Two 4.5 inch pipeline for transferring Glycol solution.

 Onshore Facilities:
     A 56 inch pipeline of 67 km for transferring gas to the country gas trunk line;
     A 30 inch pipeline for dispatching gas condensate from the reservoir to the condensate measurement station;
     Gas and gas condensate receiving and separation unit, gas condensate stabilization, gas sweetening and dehydration unit;
     Gas dew pointing unit, demercaptanization and gas compression units for transfer;
     Sulfur recovery and granulation; and Mono Ethylene Glycol regeneration unit.

The development operation of the above mentioned phases was awarded to a consortium comprising of Eni of Italy (60%), Petronas of Malaysia (20%) and NIOC (20%) in July 2000.The refinery came onto stream officially on April 17, 2005 in presence of the then esteemed president of I.R.of Iran.