Phase 13
Production capacity from the reservoir : 2 BSCFPD
 
Offshore facilities
Number of wells: 38
Number of offshore Platforms: 4 platforms each used to produce 500 MSCFPD
 
Offshore Pipelines:
Main Pipelines: Two 32” pipelines transferring gas from the main platforms to onshore processing units, 180km long in all, together with two 4.5” lines used for MEG injection.
Infield Pipelines: Two 18” lines to transfer gas from satellite platforms to the outlets of the main platforms, totaling 14km along with two 4.5” pipelines for MEG injection.
 
Onshore Processing Unit
Gas and input liquids are processed in this processing unit, producing the following products:
50 MSCMPD of refined gas.
1.1 MT/year of liquefied gas for export.
80 thousand barrels/day of gas condensates for export.
1 MT/year of Ethane gas to feed the petrochemical plants.
 
BY PRODUCTS:
Sulphur: (by product of gas sweetening process) 400 MT/day for export.


  Picture Gallery
 