Phase 22,23 & 24
The Capacity to Produce from the Reservoir: 2 BSCFPD.
 
Offshore facilities:
Number of Wells: 38 Wells
Number of offshore platforms: 4 platforms, each used to produce 500 MSCFPD
Offshore Pipelines
Main Pipelines: Two 32” pipelines to transfer gas from the main platforms to the onshore processing unit,
totaling 210km together with two 4.5” pipelines for MEG injection.
Infield Pipelines: Two 18” & 20” pipelines to transfer gas from the satellite platforms to the main platforms’ outlets,
totaling 14km together with two 4.5” pipelines for MEG injection.
 
Onshore Processing Unit:
Gas and input liquids are processed in this processing unit, producing the following products:
50 MSCMPD of refined gas.
1.1 MT/year of liquefied gas for export.
77 thousand barrels/day of gas condensates for export.
1MT/year of Ethane gas to feed the petrochemical plants,
 
BY PRODUCTS:
Sulphur (by product of gas sweetening process): 400 MT/day for export.